WealthPKNews

WealthPK News

Image for: Tarbela nears full capacity as water storage climbs to 5.809 MAF

Tarbela nears full capacity as water storage climbs to 5.809 MAF

ISLAMABAD  -  The country’s mega water reservoir of Tarbela Dam has almost achieved its maximum conservation level of 1,550 feet.  The existing level of Tarbela is over 1,549 feet and tonight it will achieve the maximum conservation level of 1,550 feet, official source told The Nation. This year Tarbela Dam will achieved it full capacity almost 12 days ago as compared the previous year. Last year Tarbela had reached to its peak level on August 21, 2025.

The Nation
Image for: PC signs FASA with KPMG-led consortium for privatisation of HBFCL

PC signs FASA with KPMG-led consortium for privatisation of HBFCL

ISLAMABAD  -  The Privatisation Commission (PC) has signed a Financial Advisory Services Agreement (FASA) with a consortium led by KPMG, for the privatisation of House Building Finance Company Limited (HBFCL). This would be the second attempt to privatise House Building Finance Company Limited (HBFCL), reflecting a renewed effort by the Privatisation Commission. In the previous attempt, only a single bidder i.e. Pakistan Mortgage Refinance Company Limited (PMRCL) was pre-qualified. However, the privatisation could not be successfully concluded as the bid submitted was rejected by the Privatisation Commission for being lower than the Reference Price approved by the Federal Cabinet.

The Nation

WealthPK Reports

Image for: Pakistan to strengthen weather forecasting, climate resilience capabilities

Pakistan to strengthen weather forecasting, climate resilience capabilities

ISLAMABAD, June 22 (INP-Wealth Pakistan) -- Pakistan plans to strengthen its weather forecasting, disaster preparedness and climate resilience capabilities through a series of projects and policy initiatives. According to the Annual Plan 2026-27, a copy of which is available with Wealth Pakistan, the Pakistan Meteorological Department (PMD) has been allocated Rs1.6 billion to improve forecasting systems and disaster risk management.

WealthPK Reports
Image for: Govt plans workforce development to upgrade Sialkot surgical instruments sector

Govt plans workforce development to upgrade Sialkot surgical instruments sector

ISLAMABAD, June 21 (INP-Wealth Pakistan) -- The government will launch a Rs2.8 billion workforce development initiative to systematically enhance workforce productivity and technical competence across the sectors of surgical instruments and emerging medical devices by upgrading technical training centres in Sialkot and allied cluster areas, according to a document available with Wealth Pakistan.

WealthPK Reports
Image for: KSE-100 gains 3.8% in third week of June as budget measures, easing US-Iran tensions lift sentiment

KSE-100 gains 3.8% in third week of June as budget measures, easing US-Iran tensions lift sentiment

ISLAMABAD, June 21 (INP–Wealth Pakistan) -- The Pakistan Stock Exchange (PSX) posted a strong recovery during the third week of June, with the benchmark KSE-100 Index gaining 6,523 points, or 3.79% week-on-week, to close at 178,923 points, as investor sentiment improved following the FY27 budget announcement, easing geopolitical tensions in the Middle East and supportive macroeconomic developments.

WealthPK Reports

Data News

Image for: Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

ISLAMABAD - Work has formally begun on shifting Thar coal mining from diesel to the national grid after the award of the contract, saving Pakistan an estimated $25-30 million in foreign exchange annually. A review meeting on the electrification of Thar Block I and Block II was Wednesday informed that the contract has been awarded, the contractor has mobilized at the site, and completion has been brought forward to the first quarter of 2028 (by April 2028), well ahead of the original end-2028 target by roughly eight to nine months. The progress review meeting on the electrification of Thar Block I and Block II was chaired by Federal Minister for Power Awais Leghari, and attended by representatives from the Thar Coal and Energy Board (TCEB), Sindh Engro Coal Mining Company (SECMC), Sino Sindh Resources Limited (SSRL), the Power Division, and Hyderabad Electric Supply Company (HESCO). The project aimed to connect mining operations in both blocks to the grid through 132kV transmission infr

The Nation