WealthPKNews

WealthPK News

Image for: PPL discovers gas reserves in Sujawal district

PPL discovers gas reserves in Sujawal district

ISLAMABAD  -  Pakistan Petroleum Limited (PPL), operator of the Sirani Exploration License holding 75% Working Interest (WI), along with Joint Venture Partner Government Holdings (Private) Limited (GHPL) holding 25% WI, made a gas discovery from its exploration well Dolphin X-1, located in district Sujawal of Sindh province. The well, Dolphin X-1, was spudded as an exploratory well on 17th April 2026 and drilled down to 3,850 meters MD (Measured Depth) to test the hydrocarbon potential of the Chiltan Formation. Hydrocarbon-bearing intervals were identified based on drilling results and open-hole log data. During post-acid testing of the Chiltan Formation, good-quality gas with a heating value of approximately 1,000 Btu/scf flowed at a rate of 0.942 MMscfd (Million Standard Cubic Feet Per Day) against a Wellhead Flowing Pressure (WHFP) of 211 psig at a 32/64” choke. During pre-acid testing of the same formation, condensate was also surfaced at an initial rate of 94 BPD (Barrels Per Day)

The Nation
Image for: PSX gains 397 points

PSX gains 397 points

ISLAMABAD  -  The benchmark KSE 100-index of the PSX witnessed bullish trend on Monday, gaining 397.83 points, a positive change of 0.22 percent, to close at 180,502.45 points against 180,104.61 points recorded in the previous trading session. The ready market witnessed a trading volume of 1.048 billion shares, compared to 891.332 million shares traded in the previous session, while the traded value increased to Rs48.325 billion from Rs36.690 billion. Market capitalisation rose to Rs20.199 trillion from Rs20.130 trillion recorded a day earlier. Out of 498 companies that traded in the ready market, 197 posted gains, 276 suffered losses, while 25 remained unchanged, reflecting a mixed trend across the market. Cnergyico PK led the volume chart with 312.518m shares, followed by D.S. Industries Limited with 124.770m shares and K-Electric Limited with 30.717m shares. Among the top gainers, PIA Holding Company LimitedB surged by Rs516.46 to close at Rs17,600.00, while Attock Refinery Ltd adva

The Nation

WealthPK Reports

Image for: Budget size more than triples in FY26, but PSDP stuck near FY17 levels

Budget size more than triples in FY26, but PSDP stuck near FY17 levels

ISLAMABAD, June 09 (INP-Wealth Pakistan) -- Pakistan’s federal development budget for FY2025-26 has been revised down to Rs820 billion from the original allocation of Rs1,000 billion, pushing public development spending close to its FY2016-17 nominal level despite a much larger federal budget and economy, according to a Ministry of Planning, Development and Special Initiatives presentation given to a parliamentary panel.

WealthPK Reports
Image for: China’s AI-focused education overhaul offers lessons for Pakistan

China’s AI-focused education overhaul offers lessons for Pakistan

ISLAMABAD, June 04 (INP-Wealth Pakistan) -- China’s decision to redesign university programmes around artificial intelligence, robotics, biomanufacturing, digital trade and smart agriculture offers a valuable lesson for Pakistan, where experts believe higher education reforms must shift from merely increasing the number of degrees to building skills, improving employability and strengthening links with emerging industries.

WealthPK Reports

Data News

Image for: Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

ISLAMABAD - Work has formally begun on shifting Thar coal mining from diesel to the national grid after the award of the contract, saving Pakistan an estimated $25-30 million in foreign exchange annually. A review meeting on the electrification of Thar Block I and Block II was Wednesday informed that the contract has been awarded, the contractor has mobilized at the site, and completion has been brought forward to the first quarter of 2028 (by April 2028), well ahead of the original end-2028 target by roughly eight to nine months. The progress review meeting on the electrification of Thar Block I and Block II was chaired by Federal Minister for Power Awais Leghari, and attended by representatives from the Thar Coal and Energy Board (TCEB), Sindh Engro Coal Mining Company (SECMC), Sino Sindh Resources Limited (SSRL), the Power Division, and Hyderabad Electric Supply Company (HESCO). The project aimed to connect mining operations in both blocks to the grid through 132kV transmission infr

The Nation