WealthPKNews

WealthPK News

Image for: Stock market gains over 1,841 points

Stock market gains over 1,841 points

ISLAMABAD  -  The benchmark KSE-100 Index of the Pakistan Stock Exchange (PSX) stayed bullish on Friday, gaining 1,841.39 points, a positive change of 1.09 percent, to close at 170,884.59 points against 169,043.20 points recorded in the previous trad­ing session. The ready market witnessed a trad­ing volume of 576.258 million shares, compared to 386.368 million shares traded in the previ­ous session, while the traded value increased to Rs22.409 billion from Rs20.091 billion.

The Nation
Image for: BYD to begin local assembly of Sealion 6 in Pakistan in Q4 2026

BYD to begin local assembly of Sealion 6 in Pakistan in Q4 2026

LAHORE  -  BYD, the world’s No 1 NEV brand, in partnership with Mega Motor Company (MMC), is showcasing the next chapter of new energy mobility in Pakistan at the Paki­stan Auto Show (PAPS) 2026, bringing together electric and plug-in hybrid vehicles alongside the introduction of a new brand and a range of genuine BYD ac­cessories designed to enhance the ownership experience. At the centre of the showcase is the BYD SEALION 6, which is planned to become BYD’s first lo­cally assembled vehicle in Paki­stan, with production targeted to commence in Q4 2026.

The Nation

WealthPK Reports

Image for: Pakistan, China strengthen cooperation on climate resilience, disaster preparedness

Pakistan, China strengthen cooperation on climate resilience, disaster preparedness

ISLAMABAD, July 01 (INP-Wealth Pakistan) -- Pakistan is expanding cooperation with China to strengthen climate resilience and disaster preparedness through advanced technologies, including artificial intelligence-based forecasting, satellite monitoring and intelligent early warning systems, as climate-related disasters continue to pose increasing risks to lives, infrastructure and economic development.

WealthPK Reports

Data News

Image for: Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

ISLAMABAD - Work has formally begun on shifting Thar coal mining from diesel to the national grid after the award of the contract, saving Pakistan an estimated $25-30 million in foreign exchange annually. A review meeting on the electrification of Thar Block I and Block II was Wednesday informed that the contract has been awarded, the contractor has mobilized at the site, and completion has been brought forward to the first quarter of 2028 (by April 2028), well ahead of the original end-2028 target by roughly eight to nine months. The progress review meeting on the electrification of Thar Block I and Block II was chaired by Federal Minister for Power Awais Leghari, and attended by representatives from the Thar Coal and Energy Board (TCEB), Sindh Engro Coal Mining Company (SECMC), Sino Sindh Resources Limited (SSRL), the Power Division, and Hyderabad Electric Supply Company (HESCO). The project aimed to connect mining operations in both blocks to the grid through 132kV transmission infr

The Nation