WealthPKNews

WealthPK News

Image for: Govt to levy up to 10% ADL on ICE vehicles

Govt to levy up to 10% ADL on ICE vehicles

The government has decided to impose an Automotive Development Levy (ADL) of 2% to 10% on imported and locally manufactured internal combustion engine (ICE) vehicles to speed up electric vehicle adoption, with a clear vehicle classification and the minimum levy on public service vehicles and vehicles up to 2000cc. ICE refers to conventional petrol- or diesel-powered vehicles that use an engine to burn fuel and generate power. The levy will not apply to imported and locally manufactured 2/3-wheelers, tractors and vehicles with engine capacity up to 1000cc, and it will carry a sunset clause while remaining enforced during the policy period.

Tribune

WealthPK Reports

Image for: Pakistan plans increased funding for international cooperation, capacity-building

Pakistan plans increased funding for international cooperation, capacity-building

ISLAMABAD, June 25 (INP-Wealth Pakistan) -- Pakistan has earmarked Rs13.387 billion as its contribution to international agencies and organisations during the upcoming financial year 2026-27. Allocations under this head will increase to Rs14.846 billion in FY2027-28 and Rs16.524 billion in FY2028-29, reflecting the government's commitment to meeting its obligations to multilateral institutions and maintaining engagement with international development and financial bodies, according to the Medium-Term Performance-based Budget document, available with Wealth Pakistan.

WealthPK Reports
Image for: Pakistan to strengthen weather forecasting, climate resilience capabilities

Pakistan to strengthen weather forecasting, climate resilience capabilities

ISLAMABAD, June 22 (INP-Wealth Pakistan) -- Pakistan plans to strengthen its weather forecasting, disaster preparedness and climate resilience capabilities through a series of projects and policy initiatives. According to the Annual Plan 2026-27, a copy of which is available with Wealth Pakistan, the Pakistan Meteorological Department (PMD) has been allocated Rs1.6 billion to improve forecasting systems and disaster risk management.

WealthPK Reports
Image for: Govt plans workforce development to upgrade Sialkot surgical instruments sector

Govt plans workforce development to upgrade Sialkot surgical instruments sector

ISLAMABAD, June 21 (INP-Wealth Pakistan) -- The government will launch a Rs2.8 billion workforce development initiative to systematically enhance workforce productivity and technical competence across the sectors of surgical instruments and emerging medical devices by upgrading technical training centres in Sialkot and allied cluster areas, according to a document available with Wealth Pakistan.

WealthPK Reports
Image for: KSE-100 gains 3.8% in third week of June as budget measures, easing US-Iran tensions lift sentiment

KSE-100 gains 3.8% in third week of June as budget measures, easing US-Iran tensions lift sentiment

ISLAMABAD, June 21 (INP–Wealth Pakistan) -- The Pakistan Stock Exchange (PSX) posted a strong recovery during the third week of June, with the benchmark KSE-100 Index gaining 6,523 points, or 3.79% week-on-week, to close at 178,923 points, as investor sentiment improved following the FY27 budget announcement, easing geopolitical tensions in the Middle East and supportive macroeconomic developments.

WealthPK Reports

Data News

Image for: Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

Thar coal mining to shift from diesel to grid power, saving $25-30 million annually

ISLAMABAD - Work has formally begun on shifting Thar coal mining from diesel to the national grid after the award of the contract, saving Pakistan an estimated $25-30 million in foreign exchange annually. A review meeting on the electrification of Thar Block I and Block II was Wednesday informed that the contract has been awarded, the contractor has mobilized at the site, and completion has been brought forward to the first quarter of 2028 (by April 2028), well ahead of the original end-2028 target by roughly eight to nine months. The progress review meeting on the electrification of Thar Block I and Block II was chaired by Federal Minister for Power Awais Leghari, and attended by representatives from the Thar Coal and Energy Board (TCEB), Sindh Engro Coal Mining Company (SECMC), Sino Sindh Resources Limited (SSRL), the Power Division, and Hyderabad Electric Supply Company (HESCO). The project aimed to connect mining operations in both blocks to the grid through 132kV transmission infr

The Nation